Hall constructionGraf
Leichtbauhalle
Hall construction
Graf
Leichtbauhalle
ONO plus VAT
€8,403
Year of construction
1990
Condition
Used
(limited functionality)
Location
Frankenthal (Pfalz) 

Basic data
- Machine type:
- Hall construction
- Manufacturer:
- Graf
- Model:
- Leichtbauhalle
- Year of construction:
- 1990
- Condition:
- ready for operation (used)
- Functionality:
- limited functionality
Price & Location
ONO plus VAT
€8,403
- Location:
- Frankenthal, 67227 Frankenthal (Pfalz), Deutschland

Call
Details about the offer
- Listing ID:
- A233-26811
- Update:
- 12.11.2026
Description
The halls are constructed from galvanized sheet steel. The vertical supports (Image 2) are also made of double-layered zinc sheet and are not embedded in concrete. A strip foundation made of wood/metal was built and secured to the ground with ground anchors, onto which the hall structure was placed and screwed. (20mm nuts)
During disassembly, unscrew the sheet metal cladding; the longitudinal supports are only clipped in. If you detach the lateral, angled struts, you can fold the individual frames together. If the loading area is short, you can separate the frames in the middle.
We have indicated the functionality as "limited." While this is not entirely accurate, it is intended to illustrate that there are also minor damages, such as dents in the sheet metal. This refers to Hall 2A, which is 34m x 16m = 544 square meters.
Fsdo Ai Rc Nopfx Aciopp
We will be closing the site on December 31, 2026, which is why we cannot provide any guarantee or warranty. Therefore, we are selling everything as DIY materials or spare parts. Until December 31, we can assist with loading using a forklift. The hall must be dismantled by the buyer!!!
A new sectional door was installed in the hall 4 months ago, which is why we are charging an additional price of €4,000.00 (gross).
Viewings can be arranged on weekdays during normal office hours by prior appointment.
The listing was translated automatically. Translation errors are possible.
During disassembly, unscrew the sheet metal cladding; the longitudinal supports are only clipped in. If you detach the lateral, angled struts, you can fold the individual frames together. If the loading area is short, you can separate the frames in the middle.
We have indicated the functionality as "limited." While this is not entirely accurate, it is intended to illustrate that there are also minor damages, such as dents in the sheet metal. This refers to Hall 2A, which is 34m x 16m = 544 square meters.
Fsdo Ai Rc Nopfx Aciopp
We will be closing the site on December 31, 2026, which is why we cannot provide any guarantee or warranty. Therefore, we are selling everything as DIY materials or spare parts. Until December 31, we can assist with loading using a forklift. The hall must be dismantled by the buyer!!!
A new sectional door was installed in the hall 4 months ago, which is why we are charging an additional price of €4,000.00 (gross).
Viewings can be arranged on weekdays during normal office hours by prior appointment.
The listing was translated automatically. Translation errors are possible.
Documents
Seller
Note: Register for free or log in, to access all information.
Last online: Today
Registered since: 2026
10 listings online
Send inquiry
Telephone & Fax
+49 6122 ... show
These listings may also fit your interest.
Success:
Your message has been sent.
Listing
Frankenthal (Pfalz)
7,853 km
Hall construction
GrafLeichtbauhalle
GrafLeichtbauhalle
Success:
Your message has been sent.
Listing
Frankenthal (Pfalz)
7,853 km
Hall construction
GrafLeichtbauhalle
GrafLeichtbauhalle
Success:
Your message has been sent.
Listing
Frankenthal (Pfalz)
7,853 km
Hall construction
GrafLeichtbauhalle
GrafLeichtbauhalle
Your listing has been deleted successfully
An error has occurred































