Heating
VAS FB 12,9

Year of construction
2012
Condition
Used
Location
Doren Austria
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
Heating VAS FB 12,9
more Images
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
VAS FB 12,9
Show images
Show map

Machine data

Machine type:
Heating
Manufacturer:
VAS
Model:
FB 12,9
Year of construction:
2012
Condition:
used

Price & Location

Location:
Huban 264, 6933 Doren, Österreich Austria
Call

Details about the offer

Listing ID:
A184-96656
Update:
07.05.2026

Description

Complete Power Plant, Full CHP Plant Wood Chip Heating / Thermal Oil System VAS 6MW Thermal + 1.1MW Electrical Output

The plant was originally built in 2003 & 2004. Major components such as the thermal oil heater and hot water ECO were entirely replaced in 2012.

Components:
- Walking floor
- Hydraulic feed
- VAS combustion chamber
- VAS thermal oil heater
- Hot water ECO
- Dedusting (coarse and fine dust removal)
- Ash removal by chain conveyor
- Exhaust gas path incl. fans and chimney system
- Turboden ORC module with 1.1MW electrical output
- Complete plant control with visualization
Dsdpfxovytfuo Ad Njut

Including units, pumps, and valves
Including thermal oil pumps
Including thermal oil
Including all accessories required for operation

The plant is being sold because a larger plant with significantly higher capacity has been built nearby. The walls and roof of the boiler house can also be included if required.

Remaining thermal output in operation with Turboden ORC module: 5MW
Electrical output ORC module: 1.1MW
Fuel consumption approx. 9 loose cubic meters per hour (depending on fuel)

Dismantling must be carried out by the buyer.
Further information on request.

The listing was translated automatically. Translation errors are possible.

Seller

Last online: Yesterday

Registered since: 2023

5 listings online

Call

Send inquiry

Countryus 
Germany
Austria
Switzerland
United States
United Kingdom
France
Belgium
Spain
Mexico
Italy
Netherlands
Poland
Russian Federation
Belarus
Ukraine
Estonia
Turkey
New Zealand
Ireland
Czech Republic
Denmark
Finland
Sweden
Norway
Luxembourg
Greece
Lithuania
Latvia
Iceland
Portugal
Brazil
Venezuela
Argentina
Hungary
Slovakia
Romania
Moldova
Slovenia
Serbia
Montenegro
Albania
Croatia
Bulgaria
Macedonia
Bosnia and Herzegovina
Israel
Egypt
Morocco
India
Indonesia
South Korea
Japan
Thailand
Malaysia
Vietnam
China (People's Republic of China)
Taiwan
Iran
Bangladesh
Note: Your inquiry will be forwarded to all sellers in this machine category. This allows you to receive a large number of offers.
The inquiry could not be sent. Please try again later.

Telephone & Fax

+43 5516 ... show