Switchgear & controlAnsaldo Energia
Switchgear & control
Ansaldo Energia
Year of construction
2017
Condition
Used
Location
Odžak 

Show images
Show map
Machine data
- Machine type:
- Switchgear & control
- Manufacturer:
- Ansaldo Energia
- Year of construction:
- 2017
- Condition:
- like new (used)
Price & Location
- Location:
- Titova b.b., 76290 Odzak, Bosnia and Herzegovina

Call
Details about the offer
- Listing ID:
- A209-08267
- Update:
- 11.01.2026
Description
Ansaldo Energia power plant consist of 2 units - Each unit 285 MW ( CCPP )
Ansaldo Energia - 2 x 285 MW CCPP
Working hours - ZERO
2 x 285 MW Ansaldo Energia , Combined Cycle Power Plants .
Fpedsx Tcinjpfx Agmsb
Ansaldo Energia Gas turbine model AE94.2
YOM: 2017
Hours: 0
Frequency: 50 Hz
Power of Gas turbine generator: 185 MW
Gas Turbine generator model: QF-180-2
Gas turbine generator workers:Shanghai Electric
Gas turbine generator voltage: 18 KV
Steam turbine workers: Shanghai Electric
Steam turbine generator: QF-100-2
Steam turbine generator output: 100 MW
Steam turbine generator worker: Shanghai Electirc
Steam turbine generator voltage: 10.5 KV
HRSG workers: Hangzhou Boiler Factory
HRSG model: NG-AE94.2-R
HRSG output steam: 241.1t/h
HRSG temperature: 517°C
HRSG max.Pressure: 8.89MPA.G
Heat rate of CCCP: 52% to 53%
Scope of suppy:
Turbine + Alternator + Cooler + Lube + Added Gas + Water treament + Steam tank + steam turbine(100mw+18mw) + HRSG + Steam turbine alternator + Chimney + Tube + Fire fighter + transformer + Control + High volt cabine + low volt cabine + mcc + Hv comp art
IT IS COMPLETED POWER PLANT !
Ansaldo Energia - 2 x 285 MW CCPP
Working hours - ZERO
2 x 285 MW Ansaldo Energia , Combined Cycle Power Plants .
Fpedsx Tcinjpfx Agmsb
Ansaldo Energia Gas turbine model AE94.2
YOM: 2017
Hours: 0
Frequency: 50 Hz
Power of Gas turbine generator: 185 MW
Gas Turbine generator model: QF-180-2
Gas turbine generator workers:Shanghai Electric
Gas turbine generator voltage: 18 KV
Steam turbine workers: Shanghai Electric
Steam turbine generator: QF-100-2
Steam turbine generator output: 100 MW
Steam turbine generator worker: Shanghai Electirc
Steam turbine generator voltage: 10.5 KV
HRSG workers: Hangzhou Boiler Factory
HRSG model: NG-AE94.2-R
HRSG output steam: 241.1t/h
HRSG temperature: 517°C
HRSG max.Pressure: 8.89MPA.G
Heat rate of CCCP: 52% to 53%
Scope of suppy:
Turbine + Alternator + Cooler + Lube + Added Gas + Water treament + Steam tank + steam turbine(100mw+18mw) + HRSG + Steam turbine alternator + Chimney + Tube + Fire fighter + transformer + Control + High volt cabine + low volt cabine + mcc + Hv comp art
IT IS COMPLETED POWER PLANT !
Seller
Note: Register for free or log in, to access all information.
Send inquiry
Telephone & Fax
+385 31 8... show
Your listing has been deleted successfully
An error has occurred